COMING SHORTLY - CAST Statement on the 3 Billion Tunnel

We have opposed the concept and construction of the 3B
Tunnel from the time it was first proposed by Jim Soorley.

We're preparing a detailed statement to explain why we
continue to vigorously oppose the Tunnel, and why we urge
all motorists to boycott the Tunnel.

Keep checking this site for our full statement.

INFORMATION ALERT CIty Bus Stops relocated from Monday 8 March

Bus stops 56 and 57 on Queen Street near Post Office
Square will be temporarily closed from Monday 8
March to Wednesday 30 June due to streetscape
construction works.
Stop 58 will be moved by up to 20m in the direction
of travel and services from this stop will also be affected.

For full details of bus services affected and a map of
the location of the new stops, go to

http://www.translink.com.au/servicechange.php?id=463

OUR SUBMISSIONS TO TRANSLINK AND OTHERS

We are continuing to make submissions on behalf of public transport users, cyclists and pedestrians to Translink, service providers and Government.

These are shown on the page below described as 'Submissions to Translink' together with current status and replies if any.

If you are aware of a transport service or systemic fault that needs to be rectified or improved, contact us and we'll follow up the issue with the relevant authority on your behalf.

Friday, January 19, 2007

Media release 19 Jan

RiverCity Motorway misleading public on North-South Bypass Tunnel

Community Action for Sustainable Transport believes RiverCity Motorway (the consortium responsible for building, owning and operating the North-South Bypass Tunnel) is misleading the public through their advertising.

RiverCity Motorway’s advertisements claim that the North-South Bypass Tunnel is “designed to alleviate the high congestion on Brisbane ’s roads”.

But RiverCity Motorway's tunnel design is forecast to cause a 12% increase in traffic on surface connecting roads when compared with a No-tunnel option

And it leads to a 15% increase in traffic when compared with Council’s original NSBT design.

CAST believes RiverCity Motorway is likely to be satisfied with continued high levels of traffic congestion on surface roads, in order to encourage more drivers to use the tunnel.

“RiverCity Motorway is responsible to its shareholders, not the people of Brisbane , and the tunnel is designed to increase make a profit, not to reduce congestion on free surface roads,” said CAST spokesperson Tristan Peach.

[For more information refer table 1, page 5 of the Noise and Vibration report prepared for the NSBT www.nsbt-eis. com/assets/ downloads/ ChangeReport/ Heggies_Noise&Vibration_May06. pdf]

Media Contact: Tristan Peach 0416478615

No comments: